Hebei Fengning Pumped Storage Power Station


Building Details of Hebei Fengning Pumped Storage Power Station

Hebei Fengning Pumped Storage Power Station has a total installed capacity of 3,600MW, and the power station is developed in two phases, with the installed capacity of the first and second phases of the project being 1,800MW respectively. The hub building is mainly composed of the upper reservoir, the lower reservoir, the water transmission system of the first and second phases of the project, the underground plant and the switch station.


As of December 2023, 10 units of the power station have been put into operation. The remaining two units will also be commissioned in 2024. The 12 units installed in the power station have a total installed capacity of 3.6 million kilowatts, making it the world's largest installed capacity among pumped storage power stations. It is a pumped storage power station with weekly regulation performance, and its energy storage capacity is the first in the world.


Design of Hebei Fengning Pumped Storage Power Station

  1. Provide fire doors for the main and auxiliary engine rooms of the power station; The maximum height of the fire door in the computer room is 3000m. Meet the requirements of sound insulation, heat preservation and fire prevention for power station operation.

  2. Provide a large form of fireproof glass partition for the main operation room of the power station, using high light transmittance and ultra-clear glass glass to ensure fire safety and clear operation vision.

  3. Provide electric blinds for the exhaust area of the power station, and cooperate with the electric induction device to realize automatic opening or closing according to the temperature.


Panoramic View


Hebei Fengning Pumped Storage Power Station


Hebei Fengning Pumped Storage Power Station


Fire Door


fire door


Fire Partition


fire partition


Motorized Louvered Door


motorized louvered door


motorized louver door


Specification of Hebei Fengning Pumped Storage Power Station

Construction and property details


Property developer:

State GRID

Architects:

Power China Railway Construction Group

Execution

2020

Total space:

2092010  m²

Height:

54.5 m

Floors

21


Installed fire seals


Multipurpose steel doors

211

Fire resistant doors

837

Fire paititions

4

Fire electric louvers

45

Order value:

92,0000 €

Hardware:

GMT

Installation period:

38 months


More ArchiPorta Doors



More ArchiPorta Door Cases


Products
WANT TO KNOW MORE ABOUT US? INQUIRE TODAY FOR SEED GREEN DOORS!
WANT TO KNOW MORE ABOUT US? INQUIRE TODAY FOR SEED GREEN DOORS!
We are passionate about professional solutions for doors.
Address:

117, 1/F, Block 2, No. 11, South Banbidian Section, Litian Road, Shunyi District, Beijing, P.R. China

ARYAN PARK BLOCK 17 ( NEXT TO SUBARU KENYA Mombasa Road)

Get In Touch With ArchiPorta

Your Name *

Your Email *

Your Phone

Company

Your Message *

Latest News About SEED GREEN Doors
A Comparative Analysis of Steel Doors, uPVC Doors, Wooden Doors, and Composite Doors
17 Jan 2026

A Comparative Analysis of Steel Doors, uPVC Doors, Wooden Doors, and Composite Doors

Types of Garage Door Locks
07 Jan 2026

Types of Garage Door Locks

How to Choose Residential House Doors?
26 Aug 2025

How to Choose Residential House Doors?